หน่วยสมรรถนะ
Remove and install aircraft pressurization control system components.
สาขาวิชาชีพการบิน
รายละเอียดหน่วยสมรรถนะ
1. รหัสหน่วยสมรรถนะ | AVT-FTN-3-021ZA |
2. ชื่อหน่วยสมรรถนะ | Remove and install aircraft pressurization control system components. |
3. ทบทวนครั้งที่ | - / - |
4. สร้างใหม่ |
![]() |
ปรับปรุง |
![]() |
5. สำหรับชื่ออาชีพและรหัสอาชีพ (Occupational Classification) | |
|
6. คำอธิบายหน่วยสมรรถนะ (Description of Unit of Competency) | |
This unit of competency applies hand skills and employs maintenance documentation/publications to remove and install the pressurization control system components of fixed wing aircraft possessing pressurization systems, during scheduled or unscheduled maintenance. This work may be carried out individually or as part of a team. |
7. สำหรับระดับคุณวุฒิ |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
8. กลุ่มอาชีพ (Sector) | |
10 Aircraft Mechanics |
9. ชื่ออาชีพและรหัสอาชีพอื่นที่หน่วยสมรรถนะนี้สามารถใช้ได้ (ถ้ามี) | |
102 Aircraft Mechanics: Helicopter |
10. ข้อกำหนดหรือกฎระเบียบที่เกี่ยวข้อง (Licensing or Regulation Related) (ถ้ามี) | |
ICAO Doc 7192 / EASA Part 66 |
11. สมรรถนะย่อยและเกณฑ์การปฏิบัติงาน (Elements and Performance Criteria) |
หน่วยสมรรถนะย่อย (EOC) | เกณฑ์ในการปฏิบัติงาน (Performance Criteria) | รหัส PC (ตามเล่มมาตรฐาน) |
รหัส PC (จากระบบ) |
---|---|---|---|
101310.01 Remove pressurization control system components. | 101310.01.01 System is rendered safe and prepared according to theapplicable maintenance manual and isolation tags are attached, wherenecessary, to ensure personnel safety. Pressurizationcontrol system component removal is performed according to the applicablemaintenance manual while noticing all relevant work health and safety (WHS) requirements. Requiredmaintenance documentation is accomplished and processed according to standardenterprise procedures. Removed components are tagged andpackaged according to specified procedures. | 101310.01.01 | 70988 |
101310.02 Install aircraft pressurization control system components. | 101310.02.01 Pressurization control system components to be installedare checked to ensure correct part numbers, modification status,serviceability and shelf life. Physical installation ofpressurization control components is carried out according to the applicablemaintenance manual. System is restored to correctoperational condition to prepare for testing, as necessary. Requiredmaintenance documentation is accomplished and processed according to standardenterprise procedures. | 101310.02.01 | 70989 |
12. ความรู้และทักษะก่อนหน้าที่จำเป็น (Pre-requisite Skill & Knowledge) | |
|
13. ทักษะและความรู้ที่ต้องการ (Required Skills and Knowledge) | |
(ก) ความต้องการด้านทักษะ
(ข) ความต้องการด้านความรู้
|
14. หลักฐานที่ต้องการ (Evidence Guide) | |
|
15. ขอบเขต (Range Statement) | |
|
16. หน่วยสมรรถนะร่วม (ถ้ามี) | |
N/A |
17. อุตสาหกรรมร่วม/กลุ่มอาชีพร่วม (ถ้ามี) | |
N/A |
18. รายละเอียดกระบวนการและวิธีการประเมิน (Assessment Description and Procedure) | |
|